Design and Prepare a Cementing Program Report

Design and prepare a cementing program for the production casing used in your previous project. The casing will be cemented 500 ft into the intermediate casing (If intermediate casing is not used consider the surface casing for wellbores where only two casings exist). Use at least 1.4 for the excess volume and also calculate the hydrostatics pressures before, during and after the cementing operation. Determine total sacks of cement, amount of water needed and volume of water to displace cement. 